Photographs from Hari Prasod Sharma of the land slide below Tindharia Workshops, on 28th September 2011
Hari took this picture from near the Tindharia workshop gateshowing the huge area of land and road collapsed with the rail line hanging
Photos showing the National Highway 55 that has been carried away by the landslide along with the support for the railway.
The back wall of the workshop has collapsed and corrugated sheeting has been stood up to protect the site.
The Darjeeling Himalayan Railway Society is a company limited by guarantee, registered in England and Wales, no. 7406570. Registered office: The Oaks, Bulleigh Barton Court, Ipplepen, Newton Abbot, Devon, TQ12 5UA.